November 2019 - December 2022 / November 2019 - October 2023
- Design and Construction of 43 miles of border wall
- Construction of 80 plus miles of roads
- Installation of lights, electric gates and remote monitoring equipment
- Remote location and extreme heat conditions
PROJECT OVERVIEW
Design Build project for 43 miles of Border Wall fence and associated critical infrastructure. Project is located in a remote area of the Texas/Mexico border. Required extensive logistical support and detailed project setup. Posillico worked with its local partners in Texas to fabricate fence sections and transport them to the site.
WHAT MADE THIS JOB COMPLEX
The availability of materials and remote location of the work area required us to set up networks of vendors and suppliers throughout Texas. Furthering these issues was the vastness of the project itself. The entire project area was stretched over 65 miles. In many cases Posillico had to build or re construct roads to access areas of the site. This made both construction and field investigation for design difficult.
HOW POSILLICO SOLVED IT
Posillico strategically placed lay down yards, offices and mobile concrete batch plants throughout the alignment. Creating a mobile system allowed us to be more flexible with our work locations and responsive to changing site conditions.