Sunrise Blvd

Location:
Ft Lauderdale, FL (Broward County)

Client:
FDOT

Contract Value:
$55.5M

Project Dates:
May 2026

Summary

Reconstruction & widening of Sunrise Blvd bridge over I-95 and corresponding I-95 on & off ramps with phased MOT to keep I-95 and Sunrise Blvd operational including demolition of existing bridge elements and installation of pile foundations, new substructure elements and construction of a new superstructure; supporting 3R project providing rehabilitation for Sunrise Blvd from US-1 to I-95; Additional scope includes concrete flatwork & ADA upgrades, ITS relocation and integration, signalization & lighting, drainage improvements, utility coordination, roadway milling, resurfacing and striping.

 

Gallery

  • Aerial view of a construction site with a large yellow crane, dirt, and scattered materials near a roadway at the bottom of the image.
  • Aerial view of a construction site beneath a raised highway, showing two yellow cylindrical formwork columns with wooden supports and surrounding debris next to a busy roadway with moving cars on the left and a red car on the right.
  • Aerial view of a multi-lane road under construction with orange cones, excavated area, and construction equipment nearby.
  • Aerial view of a construction site beside a multi-lane highway with a yellow crane, debris, and temporary barriers under an overpass, near trees and water edge.
  • Aerial view of a multi-lane highway with a tall yellow construction crane over the roadway and a river on the left, surrounded by trees and construction equipment.
  • Aerial view of a highway interchange under construction, with a large crane, concrete supports, and a yellow school bus nearby beside railroad tracks in the background.
  • Aerial view of a highway interchange with a circular pond, trees, and active construction including a tall yellow crane and traffic cones nearby and vehicles on surrounding roads.
  • Aerial view of a busy highway interchange with a construction crane and a large Public Storage building on the right.

PROJECT OVERVIEW

WHAT MADE THIS JOB COMPLEX

HOW POSILLICO SOLVED IT