Services: Civil | Categories: Micro Piles | Location: New York Metro

Canarsie Tunnel Rehabilitation

Location:
Brooklyn, NY

Client:
Judlau Contracting

Contract Value:
$372,000

Project Dates:
2018

Summary
  • Support of excavation
  • Soldier piles
  • Residential, high traffic area

PROJECT OVERVIEW

This project was part of the MTA’s extensive rehabilitation of the L Train Subway tunnel underneath the East River, after Superstorm Sandy created significant infrastructure damage. Posillico performed the installation of soldier piles at the Bedford Avenue L Train station in Williamsburg, Brooklyn, so the prime contractor could excavate from the street, down to the top of the underground station.

WHAT MADE THIS JOB COMPLEX

The complexity of this project laid primarily in the location of the site, in residential Williamsburg.  The area had heavy pedestrian traffic as the L train is the main subway line from Brooklyn to Manhattan.  The site was very tight and required precision in planning and execution, to performed work on a busy street with an adjacent active station.

HOW POSILLICO SOLVED IT

The Posillico team leveraged its extensive safety training by being thorough with safety protocols to modifying work practices and limit potential hazard and risks. Through strategic planning and execution, as well as working with the community, Posillico was successful in completing this challenging job on time and safely.