Services: Marine | Categories: Dredging, Marine Towing, Material Handling | Location: New York Metro

D1 Aton Hudson River

Location:
Hudson River, New York

Client:
AGM Marine Contractors, Inc.

Contract Value:
$150,000

Project Dates:
October 2023 – November 2023

Summary

• Rip Rap Removal and Disposal
• Post Work Survey for Strict depth tolerance by Coast Guard

Gallery

  • Marine Sideview Photo
  • Marine Sideview Photo
  • Marine Overhead Photo
  • Marine Work Photo
  • Marine Work Photo
  • Waterfront Work Photo

PROJECT OVERVIEW

Breakwater Marine (Breakwater) was the selected contractor to remove the top 10ft of an existing riprap mound structure to an elevation of -10’ at mean low water within the Hudson River. Resulting in the removal and disposal of approximately 655 CY of spoil material. Breakwater also performed a post dredge survey.

WHAT MADE THIS JOB COMPLEX

Removal of Historic Rip Rap firmly compacted in place by years of settlement and Hudson River wash in a high current location while maintaining strict final elevation tolerance.

HOW POSILLICO SOLVED IT

Patience while work to exacting standards with brute force and bucket control.