D1 Aton Hudson River
Location:
Hudson River, New York
Client:
AGM Marine Contractors, Inc.
Contract Value:
$150,000
Project Dates:
October 2023 – November 2023
• Rip Rap Removal and Disposal
• Post Work Survey for Strict depth tolerance by Coast Guard
PROJECT OVERVIEW
Breakwater Marine (Breakwater) was the selected contractor to remove the top 10ft of an existing riprap mound structure to an elevation of -10’ at mean low water within the Hudson River. Resulting in the removal and disposal of approximately 655 CY of spoil material. Breakwater also performed a post dredge survey.
WHAT MADE THIS JOB COMPLEX
Removal of Historic Rip Rap firmly compacted in place by years of settlement and Hudson River wash in a high current location while maintaining strict final elevation tolerance.
HOW POSILLICO SOLVED IT
Patience while work to exacting standards with brute force and bucket control.