NYSDOT Design-Build Services for Wellwood Avenue over Route 27

Jan 2, 2024 | News and Awards

Posillico teamed with Greenman-Pedersen, Inc. to carry out the project design work and L.K. McLean Associates, P.C. to perform professional engineering inspection on the project. This project involved demolition and removal of existing four span aluminum superstructures, substructures, foundations and approaches. The project scope included the design and reconstruction of superstructure with two span precast, post-tensioned box beams, raising the vertical clearance and widening the structure, replacing substructure, foundations and approaches. The job involved an upgraded drainage system, decorative fence, and landscaping.

  • 2017 AGC NY Jeffrey J. Zogg Build NY Award
  • 2018 ASCE LI Project of the Year – Highways