This project encompasses drainage and site improvements for the city of Mission, including scopes such as excavating a drainage ditch, installing sanitary sewer lines and maintenance holes, and implementing a comprehensive drainage system. Additionally, the project included a specialized component, which required the jacking underneath a railroad to facilitate the installation of the drainage system.
The project is a 180-acre park development. The scope included utility installation, road work, and mass excavation. Utilities included water, wastewater, and stormwater. Roadwork includes compaction and asphalt paving.
Site improvement of +/- 170-acre commercial subdivision. Scope of work includes site clearing and grading, mass excavation (+/- 190,000CY), installation of +/-8000LF of waterline, +/-5,900LF of sewer line(as deep as 14' below ground), +/-6,150LF of storm line as deep as 10'below ground, +/-36,000SY of roadway installation composed of 3% subbase lime treatment, 12" flexbase installation, 3" HMA installation, sidewalks, curb & gutters.