East Side Coastal Resiliency

Location:
Manhattan, NY

Client:
IPC Resiliency Partners

Contract Value:

Project Dates:
March 2021 to 2024

Summary
  • Provide tug service to handle and transport material barges to and from the mooring barge.
  • Provide barge charter to serve as tug mooring and storage area.
  • Provide crane barge service for setting spud piles.

PROJECT OVERVIEW

The ESCR project was a challenging project aimed at creating greater protection to Manhattan in the face of rising sea levels and increasingly frequent storm events.  Due to site constraints, the contractor was required to receive material deliveries and debris exports by barge.  Breakwater Marine was able to provide onsite 24-7 tug service to handle transport material barges along the length of the project located along the East River of NYC.  BWM also provided crane barge service to mobilize spudded barges for staging areas barge charters for offsite workshop and equipment staging.

WHAT MADE THIS JOB COMPLEX

The East River of NY has a high level of boat traffic and turbulent water making anchorage and navigation challenging.

HOW POSILLICO SOLVED IT

BWM mobilized a spud barge for mooring the tug and upgraded the spud wells to handle the force of the wave action.  BWM tug captains maintained communication with the USCG and Harbor patrol to alert them of any barge moves.